CONSTRUCTION STUDIO / WORKED EXAMPLES
Built, not generated.
Explore complete ledgers, construction excerpts and method studies as inspectable 3D assemblies.
The complete building uses the validated construction ledger.
3 joist stations · independent stone bearings
Drag wood ↑↓ to move the floor. Adjust wall length or spacing above to regenerate coursing, pockets, joists and boards. Longer spans add a pier-supported central timber beam (illustrative only).
Concept geometry only — not engineered construction.
Changes regenerate the stone reveal and both shutter leaves. Dimensions and fastening are illustrative.
Study only. Bearings, joinery and glazing attachments remain unverified.
The window's separate masonry or timber parts are rebuilt by the server; no post-construction scaling, unseen anchor or certified movement is implied.
CONSTRUCTION-LEDGER / 2
FREE ORBIT · ORTHOGRAPHIC
Loading renderer…
Drag to orbit · Scroll / pinch to zoom · Tap a part to inspect
Awaiting construction ledger0 / 0